The following pages link to Pei-Chann Chang (Q400874):
Displaying 17 items.
- EA/G-GA for single machine scheduling problems with earliness/tardiness costs (Q400876) (← links)
- One-machine rescheduling heuristics with efficiency and stability as criteria (Q1201849) (← links)
- (Q1333454) (redirect page) (← links)
- A state-space search approach for parallel processor scheduling problems with arbitrary precedence relations (Q1333456) (← links)
- A practical approach for parts scheduling with alternative process plans in automated manufacturing systems (Q1339827) (← links)
- A self-guided genetic algorithm for permutation flowshop scheduling problems (Q1762134) (← links)
- A trend-based segmentation method and the support vector regression for financial time series forecasting (Q1954994) (← links)
- A branch and bound approach for single machine scheduling with earliness and tardiness penalties (Q1963033) (← links)
- Genetic algorithm integrated with artificial chromosomes for multi-objective flowshop scheduling problems (Q2518432) (← links)
- (Q2779884) (← links)
- A hybrid genetic-immune algorithm with improved lifespan and elite antigen for flow-shop scheduling problems (Q2967585) (← links)
- Combining SOM and GA-CBR for Flow Time Prediction in Semiconductor Manufacturing Factory (Q3535527) (← links)
- (Q3602081) (← links)
- Kernel Sparse Representation-Based Classifier (Q4573612) (← links)
- A fuzzy neural network for the flow time estimation in a semiconductor manufacturing factory (Q5385435) (← links)
- An adaptive genetic clustering method for exploratory mining of feature vector and time series data (Q5444411) (← links)
- Advances in Neural Networks – ISNN 2005 (Q5707469) (← links)