Pages that link to "Item:Q4015264"
From MaRDI portal
The following pages link to A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing (Q4015264):
Displayed 23 items.
- Multi-level multi-item lot size planning with limited resources and general manufacturing structure. (Q684381) (← links)
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches (Q857326) (← links)
- A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex (Q884075) (← links)
- Capacitated lot-sizing with extensions: a review (Q926571) (← links)
- A cross entropy-lagrangean hybrid algorithm for the multi-item capacitated lot-sizing problem with setup times (Q954053) (← links)
- Capacitated lot sizing and sequence dependent setup scheduling: An iterative approach for integration (Q983631) (← links)
- A multi-item inventory model for deteriorating items under inflation and permissible delay in payments with exponential declining demand (Q998690) (← links)
- The multi-item capacitated lot-sizing problem with safety stocks and demand shortage costs (Q1025236) (← links)
- GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem (Q1044091) (← links)
- Lot sizing and scheduling -- survey and extensions (Q1278770) (← links)
- Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions (Q1303540) (← links)
- Multi-item capacitated lot-sizing by a cross decomposition based algorithm (Q1339158) (← links)
- Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs (Q1781573) (← links)
- Solving large-scale profit maximization capacitated lot-size problems by heuristic methods (Q2369969) (← links)
- Dynamic capacitated lot-sizing problems: a classification and review of solution approaches (Q2379665) (← links)
- The profit maximizing capacitated lot-size (PCLSP) problem (Q2432891) (← links)
- A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines (Q2433465) (← links)
- The multi-item capacitated lot-sizing problem with setup times and shortage costs (Q2464221) (← links)
- Single item lot sizing problems (Q2566041) (← links)
- (Q3585642) (← links)
- Modeling and Managing Uncertainty in Process Planning and Scheduling (Q3638500) (← links)
- LP-based heuristics for the capacitated lot-sizing problem: The interaction of model formulation and solution algorithm (Q4674438) (← links)
- Modeling industrial lot sizing problems: a review (Q5385468) (← links)