Pages that link to "Item:Q4062189"
From MaRDI portal
The following pages link to Note—A Note on “A Simple CPM Time-Cost Tradeoff Algorithm” (Q4062189):
Displaying 9 items.
- A network flow procedure for project crashing with penalty nodes (Q790038) (← links)
- The discrete time/cost trade-off problem: Extensions and heuristic procedures (Q835571) (← links)
- A heuristic procedure for solving the dynamic probabilistic project expediting problem (Q948658) (← links)
- Project management with time, cost, and quality considerations (Q1266596) (← links)
- New computational results for the discrete time/cost trade-off problem with time-switch constraints (Q1772840) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)
- A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search (Q2383848) (← links)
- A new approach based on the surrogating method in the project time compression problems (Q2507391) (← links)
- (Q5077804) (← links)