Pages that link to "Item:Q4073091"
From MaRDI portal
The following pages link to Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model (Q4073091):
Displaying 37 items.
- An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors (Q421617) (← links)
- Optimizing multi-stage production for an assembly-type supply chain with unequal sized batch shipments (Q430956) (← links)
- Optimizing a multi-stage production/inventory system by DC programming based approaches (Q461449) (← links)
- Multi-stage production with variable lot sizes and transportation of partial lots (Q794920) (← links)
- A bargaining model with asymmetric information for a single supplier-single buyer problem (Q817539) (← links)
- Optimizing a production system with rework and equal sized batch shipments (Q850297) (← links)
- Multi-stage production-inventory systems (Q915630) (← links)
- A heuristic approach for determining lot sizes and schedules using power-of-two policy (Q933870) (← links)
- Optimal lot streaming for multiple products in a two-machine flow shop (Q1127157) (← links)
- Production scheduling and sequencing for multi-stage production systems (Q1144486) (← links)
- A unified EPQ model for packaging two items jointly manufactured through several stages (Q1150304) (← links)
- Lot streaming with detached setups in three-machine flow shops (Q1278538) (← links)
- A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes (Q1331612) (← links)
- Lot streaming in three-stage production processes (Q1331614) (← links)
- Cyclic scheduling to minimize inventory in a batch flow line (Q1331620) (← links)
- Approximation methods for discrete lot streaming in flow shops (Q1375120) (← links)
- Expected time in system analysis of a single-machine multi-item processing center. (Q1429930) (← links)
- Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling (Q1603328) (← links)
- Learning effects and the phenomenon of moving bottlenecks in a two-stage production system (Q1791510) (← links)
- Flow shop scheduling with lot streaming (Q1824545) (← links)
- Lot streaming models with a limited number of capacitated transporters in multistage batch production systems (Q1879789) (← links)
- Optimal mixed batch shipment policy with variable safety factor for the single-vendor single-buyer production-inventory system (Q2247910) (← links)
- An optimal mixed batch shipment policy for multiple items in a single-supplier multiple-retailer integrated system (Q2251561) (← links)
- Optimal inventory policies for serial-type and assembly-type supply chains with equal sized batch (Q2514704) (← links)
- Batch sizing with controllable production rates (Q3163147) (← links)
- A model for determining job throughput times for manufacturing flow line workcells with finite buffers (Q3354587) (← links)
- On the equivalence of small batch assembly line balancing and lot streaming in a flow shop (Q3430242) (← links)
- Behaviour of a production system for varying marketing decisions (Q3494456) (← links)
- Lot-sizing in a class of multistage production inventory systems (Q3494660) (← links)
- Effect of machine failures in a multi-stage multi-facility and multi-product production-inventory system (Q3494702) (← links)
- A genetic algorithm for solving the economic lot scheduling problem in flow shops (Q3518466) (← links)
- Discontinuous optimization in a class of multi-stage production systems (Q4298942) (← links)
- Optimal investment and lot-sizing policies for improved productivity and quality (Q4398905) (← links)
- The impact of OPT and TPM on the economic production quantity (Q4851992) (← links)
- Single supplier single retailer inventory model controlled by the reorder and shipping points with sharing information (Q5497359) (← links)
- The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops. (Q5928378) (← links)
- The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic (Q5945322) (← links)