Pages that link to "Item:Q4102899"
From MaRDI portal
The following pages link to Technical Note—Finding Some Essential Characteristics of the Feasible Solutions for a Scheduling Problem (Q4102899):
Displaying 17 items.
- Local adjustments: A general algorithm (Q707084) (← links)
- Job sequencing with fuzzy processing times (Q908844) (← links)
- Reducibility among single machine weighted completion time scheduling problems (Q922287) (← links)
- An improved constraint satisfaction adaptive neural network for job-shop scheduling (Q969749) (← links)
- Characterizing the set of feasible sequences for n jobs to be carried out on a single machine (Q1135762) (← links)
- Computing improved optimal solutions to max-min flexible constraint satisfaction problems (Q1307812) (← links)
- A local constraint based analysis approach to project scheduling under general resource constraints (Q1342067) (← links)
- On not-first/not-last conditions in disjunctive scheduling (Q1590039) (← links)
- Deterministic job-shop scheduling: Past, present and future (Q1807948) (← links)
- Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge (Q1869705) (← links)
- Using MLP networks to design a production scheduling system (Q1870837) (← links)
- Dynamic problem structure analysis as a basis for constraint-directed scheduling heuristics (Q1978312) (← links)
- Two-machine shop scheduling: Compromise between flexibility and makespan value (Q2566711) (← links)
- A constraint-based perspective in resource constrained project scheduling (Q4394226) (← links)
- Dispatching rules in scheduling Dispatching rules in scheduling: a fuzzy approach (Q4394241) (← links)
- Production/maintenance cooperative scheduling using multi-agents and fuzzy logic (Q4706312) (← links)
- A new adaptive neural network and heuristics hybrid approach for job-shop scheduling (Q5945329) (← links)