Pages that link to "Item:Q4102901"
From MaRDI portal
The following pages link to Scheduling to minimize the weighted sum of completion times with secondary criteria (Q4102901):
Displaying 12 items.
- Reducibility among single machine weighted completion time scheduling problems (Q922287) (← links)
- Single machine scheduling to minimize weighted earliness subject to no tardy jobs (Q1105480) (← links)
- Multiple and bicriteria scheduling: A literature survey (Q1130028) (← links)
- Single machine scheduling to minimize weighted sum of completion times with secondary criterion - A branch and bound approach (Q1145613) (← links)
- An algorithm for single machine sequencing with deadlines to minimize total weighted completion time (Q1170111) (← links)
- Minimizing mean tardiness subject to unspecified minimum number tardy for a single machine (Q1266653) (← links)
- An improved branch and bound algorithm for single machine scheduling with deadlines to minimize total weighted completion time. (Q1412717) (← links)
- Scheduling unit processing time jobs on a single machine with multiple criteria (Q1823849) (← links)
- Multicriteria scheduling problems: a survey (Q2773166) (← links)
- A bicriterion scheduling problem involving total flowtime and total tardiness (Q4264495) (← links)
- A Branch-and-Bound approach to solve a Bicriterion Scheduling Problem involving Squared Flowtime and Maximum Tardiness (Q4297161) (← links)
- Counting and enumeration complexity with application to multicriteria scheduling (Q5920490) (← links)