The following pages link to (Q4193237):
Displaying 7 items.
- An online algorithm for a problem in scheduling with set-ups and release times (Q534771) (← links)
- Batch scheduling to minimize maximum lateness (Q1373461) (← links)
- Scheduling the production of two-component jobs on a single machine (Q1969827) (← links)
- Approximation algorithms for problems in scheduling with set-ups (Q2476258) (← links)
- A comparison of branch-and-bound algorithms for a family scheduling problem with identical parallel machines (Q2485328) (← links)
- Using profit maximizing scheduling models to structure operational trade-offs and manufacturing strategy issues (Q2564877) (← links)
- Dynamic programming algorithms for scheduling parallel machines with family setup times (Q5926032) (← links)