The following pages link to Ramesh Bollapragada (Q421618):
Displaying 8 items.
- Discrete-time, economic lot scheduling problem on multiple, non-identical production lines (Q421620) (← links)
- A two-phase greedy algorithm to locate and allocate hubs for fixed-wireless broadband access (Q2488215) (← links)
- Constraint-Based Local Search for Inventory Control Under Stochastic Demand and Lead Time (Q2815430) (← links)
- Budget-Constrained, Capacitated Hub Location to Maximize Expected Demand Coverage in Fixed-Wireless Telecommunication Networks (Q2892299) (← links)
- Managing Inventory and Supply Performance in Assembly Systems with Random Supply Capacity and Demand (Q3115427) (← links)
- Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines (Q3116676) (← links)
- Proactive release procedures for just-in-time job shop environments, subject to machine failures (Q4651730) (← links)
- An empirical study of policies to integrate reactive scheduling and control in just-in-time job shop environments (Q4823493) (← links)