The following pages link to (Q4231913):
Displaying 7 items.
- Makespan minimization in preemptive two machine job shops (Q1377264) (← links)
- A polynomial time approximation scheme for the two-stage multiprocessor flow shop problem (Q1566707) (← links)
- Geometrical heuristics for multiprocessor flowshop scheduling with uniform machines at each stage (Q1607975) (← links)
- The convergence of stochastic algorithms solving flow shop scheduling (Q1608340) (← links)
- (Q4487091) (← links)
- The three-stage assembly flowshop scheduling problem (Q5939973) (← links)
- A 3/2-approximation algorithm for two-machine flow-shop sequencing subject to release dates. (Q5954096) (← links)