Pages that link to "Item:Q4245204"
From MaRDI portal
The following pages link to Steel production schedule generation (Q4245204):
Displayed 8 items.
- A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron \& Steel Complex (Q1577763) (← links)
- Integration of continuous caster and hot strip mill planning for steel production (Q1585914) (← links)
- Development of hybrid evolutionary algorithms for production scheduling of hot strip mill (Q1761983) (← links)
- A hybrid flowshop scheduling problem for a cold treating process in seamless steel tube production (Q2967577) (← links)
- A finite-capacity production scheduling procedure for a Belgian steel company (Q3012635) (← links)
- A nested column generation algorithm to the meta slab allocation problem in the steel making industry (Q3055414) (← links)
- Scheduling continuous aluminium casting lines (Q3541174) (← links)
- A review of planning and scheduling systems and methods for integrated steel production (Q5943554) (← links)