Pages that link to "Item:Q4245279"
From MaRDI portal
The following pages link to Automated production line design with flexible unreliable machines for profit maximization (Q4245279):
Displayed 5 items.
- Two-stage production plan of probabilistic market demand with unreliable machines and obtainable working hour capacity (Q2780829) (← links)
- On a comparison of objective function in optimal design of flexible production line with the unreliable machines (Q4522306) (← links)
- The control of a conveyor under the economical aspect (Q5307746) (← links)
- The control of a serial-capacitated production line for cost optimization (Q5691681) (← links)
- Modeling and Performance Evaluation of a Series-parallel Flow Line System with Finite Buffers (Q6160244) (← links)