Pages that link to "Item:Q4245322"
From MaRDI portal
The following pages link to A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines (Q4245322):
Displayed 7 items.
- An assessment of the effect of mass customization on suppliers' inventory levels in a JIT supply chain (Q877048) (← links)
- Balancing and sequencing mixed-model just-in-time \(U\)-lines with multiple objectives (Q879520) (← links)
- Sequencing mixed-model assembly lines: survey, classification and model critique (Q1011163) (← links)
- A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines (Q1590816) (← links)
- Controlling mixed-model assembly lines in real-time by using distributed systems (Q2569076) (← links)
- An iterated beam search algorithm for the multi-level production smoothing problem with workload smoothing goal (Q3163160) (← links)
- Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches (Q5385397) (← links)