Pages that link to "Item:Q4245378"
From MaRDI portal
The following pages link to Multi-cyclic flow shop scheduling: An application in multi-stage, multiproduct production processes (Q4245378):
Displayed 6 items.
- Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines (Q878937) (← links)
- A heuristic approach for determining lot sizes and schedules using power-of-two policy (Q933870) (← links)
- The cycle time distribution (Q3498891) (← links)
- A genetic algorithm for solving the economic lot scheduling problem in flow shops (Q3518466) (← links)
- The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops. (Q5928378) (← links)
- The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristic (Q5945322) (← links)