The following pages link to Integrating order release control with due-date assignment rules (Q4245383):
Displayed 8 items.
- Optimization-based available-to-promise with multi-stage resource availability (Q816352) (← links)
- Concerning the theory of workload control (Q1044143) (← links)
- A survey of the state-of-the-art of common due date assignment and scheduling research (Q1600949) (← links)
- Dynamic job shop scheduling for missed due date performance (Q3055352) (← links)
- A methodology for planning and controlling workload in a job-shop: a four-way decision-making problem (Q3636766) (← links)
- Real-time due-date promising by build-to-order environments (Q4671325) (← links)
- Heuristic dispatching rule to maximize TDD and IDD performance (Q4671362) (← links)
- Development of a regression-based method with case-based tuning to solve the due date assignment problem (Q5444451) (← links)