Pages that link to "Item:Q4245582"
From MaRDI portal
The following pages link to Evaluation of performance measures for multi-part, single-product kanban controlled assembly systems with stochastic acquisition and production lead times (Q4245582):
Displaying 3 items.
- Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy (Q818091) (← links)
- Supply chain models for an assembly system with preprocessing of raw materials (Q877051) (← links)
- Analysis of decentralized multi‐product pull systems with lost sales (Q5436956) (← links)