Pages that link to "Item:Q425519"
From MaRDI portal
The following pages link to Worst-case and numerical analysis of heuristic algorithms for flowshop scheduling problems with a time-dependent learning effect (Q425519):
Displaying 14 items.
- Flowshop scheduling with a general exponential learning effect (Q336933) (← links)
- Permutation flowshop problems with bi-criterion makespan and total completion time objective and position-weighted learning effects (Q337503) (← links)
- General flowshop scheduling problem with the sequence dependent setup times: a heuristic approach (Q497626) (← links)
- Four single-machine scheduling problems involving due date determination decisions (Q497630) (← links)
- Unrelated parallel-machine scheduling problems with aging effects and deteriorating maintenance activities (Q497936) (← links)
- An improved migrating birds optimisation for a hybrid flowshop scheduling with total flowtime minimisation (Q506145) (← links)
- Scheduling with job-splitting considering learning and the vital-few law (Q1652529) (← links)
- Bicriterion optimization for flow shop with a learning effect subject to release dates (Q1722948) (← links)
- Research on permutation flow shop scheduling problems with general position-dependent learning effects (Q2449372) (← links)
- Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects (Q2629988) (← links)
- Scheduling with a position-weighted learning effect and job release dates (Q5059418) (← links)
- A Note on Scheduling Jobs with Extended Sum-of-Processing-Times-Based and Position-Based Learning Effect (Q5255177) (← links)
- Research on <i>m</i>‐machine flow shop scheduling with truncated learning effects (Q6088136) (← links)
- Coordinated \textit{seru} scheduling and distribution operation problems with DeJong's learning effects (Q6555130) (← links)