Pages that link to "Item:Q4257059"
From MaRDI portal
The following pages link to Control and optimal control of assemble to order manufacturing systems under heavy traffic (Q4257059):
Displaying 3 items.
- Optimal control of price and production in an assemble-to-order system (Q1003508) (← links)
- Optimal control of a high-volume assemble-to-order system with maximum leadtime quotation and expediting (Q1007132) (← links)
- Optimal procurement strategies for contractual assembly systems with fluctuating procurement price (Q2196110) (← links)