Pages that link to "Item:Q4302667"
From MaRDI portal
The following pages link to Optimal Leadtimes Planning in a Serial Production System (Q4302667):
Displaying 7 items.
- Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates (Q421585) (← links)
- Optimal control of a divergent multi-echelon inventory system (Q1303744) (← links)
- Setting optimal planned leadtimes in configure-to-order assembly systems (Q1622813) (← links)
- Measurement and optimization of responsiveness in supply chain networks with queueing structures (Q1694322) (← links)
- Reducing the cost of defects in multistage production systems: A budget allocation perspective (Q1869497) (← links)
- An ordinal optimization based evolution strategy to schedule complex make-to-order products (Q3430256) (← links)
- Product recovery in stochastic remanufacturing systems with multiple reuse options (Q5943563) (← links)