Pages that link to "Item:Q4363602"
From MaRDI portal
The following pages link to A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows (Q4363602):
Displaying 26 items.
- A genetic algorithm for resource investment problem with discounted cash flows (Q865553) (← links)
- Financing and reliability analysis for schedules in the project calendar planning problem (Q893924) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations (Q1025246) (← links)
- A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties (Q1036260) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (Q1265850) (← links)
- Project network models with discounted cash flows a guided tour through recent developments (Q1278075) (← links)
- PSPLIB -- a project scheduling problem library (Q1278481) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations (Q1303751) (← links)
- Order-based neighborhoods for project scheduling with nonregular objective functions. (Q1399577) (← links)
- Resource-constrained project scheduling: A survey of recent developments. (Q1406618) (← links)
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints (Q1590046) (← links)
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap (Q1652132) (← links)
- Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems (Q1753651) (← links)
- An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs (Q1762128) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- Progress payments in project scheduling problems. (Q1812008) (← links)
- Solving the resource constrained project scheduling problem with optimization subroutine library (Q1919788) (← links)
- The project scheduling problem with irregular starting time costs (Q1969764) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- On scheduling credited projects (Q2261744) (← links)
- An investigation of buffer sizing techniques in critical chain scheduling (Q2490159) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)