Pages that link to "Item:Q4363675"
From MaRDI portal
The following pages link to Scheduling Parallel Manufacturing Cells with Resource Flexibility (Q4363675):
Displayed 9 items.
- Scheduling identical parallel machines and operators within a period based changing mode (Q833547) (← links)
- Scheduling with flexible resources in parallel workcenters to minimize maximum completion time (Q850309) (← links)
- Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs (Q858442) (← links)
- Minimizing the number of late jobs for the permutation flowshop problem with secondary resources (Q941545) (← links)
- Process flexibility: design, evaluation, and applications (Q971985) (← links)
- Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound (Q1010284) (← links)
- A new bounding mechanism for the CNC machine scheduling problems with controllable processing times (Q2566700) (← links)
- Impact of worker and shop flexibility on assembly cells (Q5444495) (← links)
- Scheduling of unrelated parallel manufacturing cells with limited human resources (Q5444619) (← links)