Pages that link to "Item:Q4380546"
From MaRDI portal
The following pages link to Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions (Q4380546):
Displayed 9 items.
- Robust optimization for the cyclic hoist scheduling problem (Q300031) (← links)
- Scheduling multiple factory cranes on a common track (Q337056) (← links)
- A faster polynomial algorithm for 2-cyclic robotic scheduling (Q880563) (← links)
- Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm (Q955949) (← links)
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots (Q1042101) (← links)
- On-line scheduling in a surface treatment system (Q1969840) (← links)
- A solution for cyclic scheduling of multi-hoists without overlapping (Q2271830) (← links)
- Cyclic hoist scheduling in large real-life electroplating lines (Q2642305) (← links)
- Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows (Q5058816) (← links)