Pages that link to "Item:Q4394213"
From MaRDI portal
The following pages link to An algorithm for hoist scheduling problems (Q4394213):
Displaying 10 items.
- Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance (Q337088) (← links)
- Sequencing optimisation for makespan improvement at wet-etch tools (Q337295) (← links)
- An efficient new heuristic for the hoist scheduling problem (Q342278) (← links)
- A mixed integer programming approach for multi-cyclic robotic flowshop scheduling with time window constraints (Q693472) (← links)
- A dynamic scheduling approach for optimizing the material handling operations in a robotic cell (Q1654361) (← links)
- Handling flexibility in a ``generalised job shop'' with a fuzzy approach (Q1869716) (← links)
- Single hoist cyclic scheduling with multiple tanks: A material handling solution (Q1870835) (← links)
- On-line scheduling in a surface treatment system (Q1969840) (← links)
- Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times (Q3163706) (← links)
- A dynamic scheduling algorithm for singe-arm two-cluster tools with flexible processing times (Q5058723) (← links)