The following pages link to Lucio Bianco (Q439613):
Displaying 42 items.
- (Q242821) (redirect page) (← links)
- Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities (Q280170) (← links)
- Locating sensors to observe network arc flows: exact and heuristic approaches (Q336983) (← links)
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (Q439614) (← links)
- A new lower bound for the resource-constrained project scheduling problem with generalized precedence relations (Q709101) (← links)
- Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound (Q766253) (← links)
- Combinatorial aspects of the sensor location problem (Q867553) (← links)
- Scheduling models for air traffic control in terminal areas (Q880545) (← links)
- A heuristic procedure for the crew rostering problem (Q1194743) (← links)
- Preemptive scheduling of multiprocessor tasks on the dedicated processor system subject to minimal lateness (Q1261479) (← links)
- Minimizing total completion time subject to release dates and sequence-dependent processing times (Q1290157) (← links)
- An optimal algorithm to find the jump number of partially ordered sets (Q1366304) (← links)
- Preemptive multiprocessor task scheduling with release times and time windows (Q1374419) (← links)
- Scheduling multiprocessor tasks on a dynamic configuration of dedicated processors (Q1904737) (← links)
- Minimizing the completion time of a project under resource constraints and feeding precedence relations: an exact algorithm (Q1935550) (← links)
- Project scheduling with generalized precedence relations: a new method to analyze criticalities and flexibilities (Q2076817) (← links)
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation (Q2783969) (← links)
- A new formulation of the resource-unconstrained project scheduling problem with generalized precedence relations to minimize the completion time (Q3064043) (← links)
- Scheduling of a single machine to minimize total weighted completion time subject to release dates (Q3328239) (← links)
- (Q3489779) (← links)
- Multilevel approach to ATC problems: on-line strategic control of flights (Q3494596) (← links)
- Scheduling tasks with sequence-dependent processing times (Q3786260) (← links)
- (Q4016659) (← links)
- (Q4233383) (← links)
- (Q4233384) (← links)
- Exact And Heuristic Procedures For The Traveling Salesman Problem With Precedence Constraints, Based On Dynamic Programming (Q4294336) (← links)
- Scheduling preemptive multiprocessor tasks on dedicated processors (Q4309189) (← links)
- (Q4313062) (← links)
- (Q4356881) (← links)
- Dynamic Programming Strategies for the Traveling Salesman Problem with Time Window and Precedence Constraints (Q4367231) (← links)
- (Q4387265) (← links)
- A Network Based Model for Traffic Sensor Location with Implications on O/D Matrix Estimates (Q4411175) (← links)
- (Q4494447) (← links)
- A Set Partitioning Approach to the Crew Scheduling Problem (Q4545655) (← links)
- The Resource Constrained Project Scheduling Problem: A theoretical comparison between a recent formulation and the main time indexed linear programming based approaches (Q4603920) (← links)
- (Q4836304) (← links)
- (Q4843446) (← links)
- (Q4889095) (← links)
- (Q4943556) (← links)
- The traveling salesman problem with cumulative costs (Q5287441) (← links)
- Flow Shop No-Wait Scheduling With Sequence Dependent Setup Times And Release Dates (Q5888080) (← links)
- Linear algorithms for preemptive scheduling of multiprocessor tasks subject to minimal lateness (Q5961604) (← links)