Pages that link to "Item:Q4420128"
From MaRDI portal
The following pages link to Comparison of Scheduling Rules in a Flow Shop with Multiple Processors: A Simulation (Q4420128):
Displaying 4 items.
- A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines (Q1025264) (← links)
- Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective (Q2003565) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)