The following pages link to (Q4437036):
Displaying 50 items.
- A flow-based tabu search algorithm for the RCPSP with transfer times (Q280159) (← links)
- Resource levelling in project scheduling with generalized precedence relationships and variable execution intensities (Q280170) (← links)
- A genetic algorithm for the robust resource leveling problem (Q283265) (← links)
- Scheduling the hospital-wide flow of elective patients (Q297017) (← links)
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars (Q322689) (← links)
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (Q337299) (← links)
- Modelling and solving generalised operational surgery scheduling problems (Q342152) (← links)
- The total adjustment cost problem: applications, models, and solution algorithms (Q398909) (← links)
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm (Q400054) (← links)
- Resource constraint scheduling with a fractional shared resource (Q408404) (← links)
- Production scheduling with alternative process plans (Q439374) (← links)
- Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centres (Q439612) (← links)
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (Q439614) (← links)
- Time symmetry of resource constrained project scheduling with general temporal constraints and take-give resources (Q513559) (← links)
- New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (Q539456) (← links)
- New concepts for activity float in resource-constrained project management (Q622136) (← links)
- Dismantling of nuclear power plants at optimal NPV (Q646667) (← links)
- An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags (Q657259) (← links)
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty (Q872245) (← links)
- A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags (Q929315) (← links)
- Skilled workforce scheduling in service centres (Q954927) (← links)
- Scheduling tests in automotive R\&D projects (Q954930) (← links)
- The project scheduling problem with production and consumption of resources: a list-scheduling based algorithm (Q967432) (← links)
- Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models (Q983626) (← links)
- Parallel machine scheduling with precedence constraints and setup times (Q991370) (← links)
- A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem (Q991840) (← links)
- Learning heuristics for basic block instruction scheduling (Q1009193) (← links)
- A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times (Q1014947) (← links)
- Scheduling projects with limited number of preemptions (Q1025235) (← links)
- Maximizing the net present value of a project under uncertainty (Q1039778) (← links)
- The resource-constrained activity insertion problem with minimum and maximum time lags (Q1041351) (← links)
- A priority-rule method for project scheduling with work-content constraints (Q1046055) (← links)
- Decentralised scheduling with confidentiality protection (Q1694787) (← links)
- Using constraint programming for solving RCPSP/MAX-cal (Q1699524) (← links)
- Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem (Q1730711) (← links)
- Recursive logic-based Benders' decomposition for multi-mode outpatient scheduling (Q1751262) (← links)
- A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem (Q1752254) (← links)
- Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems (Q1754108) (← links)
- Scheduling of continuous and discontinuous material flows with intermediate storage restrictions (Q1772851) (← links)
- Direct solution to constrained tropical optimization problems with application to project scheduling (Q1789614) (← links)
- Mixed-integer linear programming for resource leveling problems (Q1926816) (← links)
- Weight-based heuristics for constraint satisfaction and combinatorial optimization problems (Q1951176) (← links)
- A hybrid differential evolution algorithm with column generation for resource constrained job scheduling (Q2003586) (← links)
- An efficient genetic algorithm for decentralized multi-project scheduling with resource transfers (Q2076410) (← links)
- On the integration of diverging material flows into resource-constrained project scheduling (Q2160494) (← links)
- A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints (Q2197158) (← links)
- The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds (Q2215556) (← links)
- Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm (Q2268503) (← links)
- A cyclic approach to large-scale short-term planning in chemical batch production (Q2268519) (← links)
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (Q2273894) (← links)