Pages that link to "Item:Q4460052"
From MaRDI portal
The following pages link to An efficient multi-pass heuristic for project scheduling with constrained resources (Q4460052):
Displaying 13 items.
- A neurogenetic approach for the resource-constrained project scheduling problem (Q709106) (← links)
- Experimental investigation of heuristics for resource-constrained project scheduling: an update (Q858327) (← links)
- Robust optimization models for project scheduling with resource availability cost (Q880580) (← links)
- A random key based genetic algorithm for the resource constrained project scheduling problem (Q947946) (← links)
- An exact algorithm for minimizing resource availability costs in project scheduling (Q976490) (← links)
- An effective heuristic for project scheduling with resource availability cost (Q1752859) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- A hybrid genetic algorithm for the resource-constrained project scheduling problem (Q2455614) (← links)
- Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm (Q2479156) (← links)
- Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem (Q2482379) (← links)
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling (Q2519076) (← links)
- Scatter search for project scheduling with resource availability cost (Q2570160) (← links)
- A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem (Q5438568) (← links)