Pages that link to "Item:Q449326"
From MaRDI portal
The following pages link to Two-stage fuzzy production planning expected value model and its approximation method (Q449326):
Displaying 5 items.
- An uncertain furniture production planning problem with cumulative service levels (Q1701616) (← links)
- Two-stage multiobjective optimization for emergency supplies allocation problem under integrated uncertainty (Q1792902) (← links)
- Studying interconnections between two classes of two-stage fuzzy optimization problems (Q1955461) (← links)
- A possibilistic-robust-fuzzy programming model for designing a game theory based blood supply chain network (Q2110767) (← links)
- Uncertain dynamical system-based decision making with application to production-inventory problems (Q2295208) (← links)