Pages that link to "Item:Q4496995"
From MaRDI portal
The following pages link to Job shop scheduling considering material handling (Q4496995):
Displayed 4 items.
- An improved particle swarm optimization with decline disturbance index (DDPSO) for multi-objective job-shop scheduling problem (Q336962) (← links)
- Integrated scheduling of handling equipment at automated container terminals (Q940900) (← links)
- Integrated production and material handling scheduling using mathematical programming and constraint programming (Q2433554) (← links)
- A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles (Q4474717) (← links)