Pages that link to "Item:Q4497222"
From MaRDI portal
The following pages link to Scheduling unbalanced cellular manufacturing systems with lot splitting (Q4497222):
Displaying 4 items.
- Using penalty function and tabu search to solve cell formation problems with fixed cell cost. (Q1422379) (← links)
- Solving a group layout design model of a dynamic cellular manufacturing system with alternative process routings, lot splitting and flexible reconfiguration by simulated annealing (Q1761211) (← links)
- Solving the serial batching problem in job shop manufacturing systems (Q1926815) (← links)
- Non-exhaustive family based dispatching heuristics–exploiting variances of processing and set-up times (Q3163249) (← links)