Pages that link to "Item:Q4510521"
From MaRDI portal
The following pages link to Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times (Q4510521):
Displayed 23 items.
- Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints (Q833543) (← links)
- Efficient algorithms for machine scheduling problems with earliness and tardiness penalties (Q940876) (← links)
- Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs (Q988377) (← links)
- Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. (Q1399596) (← links)
- Minimizing the maximal ergonomic burden in intra-hospital patient transportation (Q1734337) (← links)
- A capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection moulding (Q2240342) (← links)
- An application of unrelated parallel machine scheduling with sequence-dependent setups at Vestel Electronics (Q2273664) (← links)
- A unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems (Q2327956) (← links)
- Minimizing total tardiness in parallel machine scheduling with setup times: an adaptive memory-based GRASP approach (Q2370333) (← links)
- Parallel machine selection and job scheduling to minimize machine cost and job tardiness (Q2387248) (← links)
- Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain (Q2463495) (← links)
- The significance of reducing setup times/setup costs (Q2467248) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- A parameter-less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows (Q2673560) (← links)
- Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization (Q2958668) (← links)
- A Meta-RaPS for the early/tardy single machine scheduling problem (Q3055652) (← links)
- Fractional factorial analysis to the configuration of simulated annealing applied to the multi-objective optimization of master production scheduling problems (Q3498885) (← links)
- Parallel flowshop scheduling using Tabu search (Q4474674) (← links)
- A new multi-objective optimization method for master production scheduling problems using simulated annealing (Q4671345) (← links)
- A new and practical heuristic for Master Production Scheduling creation (Q5385344) (← links)
- Multiple machine JIT scheduling: a tabu search approach (Q5428715) (← links)
- Bi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup times (Q6070133) (← links)
- A mixed integer formulation and an efficient metaheuristic for the unrelated parallel machine scheduling problem: total tardiness minimization (Q6114940) (← links)