Pages that link to "Item:Q4546846"
From MaRDI portal
The following pages link to Survey of scheduling research involving setup times (Q4546846):
Displaying 24 items.
- A beam search heuristic for scheduling a single machine with release dates and sequence dependent setup times to minimize the makespan (Q342431) (← links)
- A survey of single machine scheduling to minimize weighted number of tardy jobs (Q380558) (← links)
- Single-machine scheduling with deteriorating jobs and setup times to minimize the maximum tardiness (Q547127) (← links)
- Schedule generation schemes for the jop-shop problem with sequence-dependent setup times: dominance properties and computational analysis (Q817121) (← links)
- A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times (Q967801) (← links)
- An improved particle swarm optimization for selective single machine scheduling with sequence dependent setup costs and downstream demands (Q1666342) (← links)
- Multimodal processes prototyping subject to grid-like network and fuzzy operation time constraints (Q1730680) (← links)
- Classifying and modeling setups and cleanings in lot sizing and scheduling (Q1753633) (← links)
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics (Q1776952) (← links)
- Minimizing the weighted number of tardy jobs on multiple machines: a review (Q2358307) (← links)
- Modeling job shop scheduling with batches and setup times by timed Petri nets (Q2389898) (← links)
- Single-machine scheduling with advanced process control constraints (Q2434278) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Learning and forgetting effects on a group scheduling problem (Q2467250) (← links)
- Group technology in a hybrid flowshop environment: a case study (Q2484361) (← links)
- A bicriteria scheduling with sequence-dependent setup times (Q2506355) (← links)
- Integer knapsack problems with set-up weights (Q2642635) (← links)
- Scheduling Unrelated Parallel Machines with Sequence Dependent Setup Times and Weighted Earliness–Tardiness Minimization (Q2958668) (← links)
- SINGLE MACHINE FAMILY SCHEDULING WITH TWO COMPETING AGENTS TO MINIMIZE MAKESPAN (Q3114615) (← links)
- Scheduling semiconductor in-line steppers in new product/process introduction scenarios (Q3163705) (← links)
- Simulation-based metamodels for scheduling a dynamic job shop with sequence-dependent setup times (Q3623397) (← links)
- Scheduling of multiple in-line steppers for semiconductor wafer fabs (Q5172568) (← links)
- Using genetic algorithms (GA) and a coloured timed Petri net (CTPN) for modelling the optimization-based schedule generator of a generic production scheduling system (Q5438649) (← links)
- A heuristic bicriteria scheduling approach for a flooring production planning problem (Q6606603) (← links)