Pages that link to "Item:Q4665270"
From MaRDI portal
The following pages link to Multiperiod production planning carrying over set-up time (Q4665270):
Displaying 11 items.
- A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times (Q342038) (← links)
- On production planning and scheduling in food processing industry:modelling non-triangular setups andproduct decay (Q342563) (← links)
- Multiperiod competitive supply chain networks with inventorying and a transportation network equilibrium reformulation (Q400033) (← links)
- A multiobjective stochastic production-distribution planning problem in an uncertain environment considering risk and workers productivity (Q541465) (← links)
- Decomposition based heuristic algorithm for lot-sizing and scheduling problem treating time horizon as a continuum (Q732896) (← links)
- A robust optimization model for multi-site production planning problem in an uncertain environment (Q872258) (← links)
- A stochastic aggregate production planning model in a green supply chain: considering flexible lead times, nonlinear purchase and shortage cost functions (Q2355914) (← links)
- Modeling of period overlapping setup times (Q2503060) (← links)
- Modeling industrial lot sizing problems: a review (Q5385468) (← links)
- Single machine multi-product capacitated lot sizing with sequence-dependent setups (Q5428738) (← links)
- Economic lot sizing problem with tank scheduling (Q6167403) (← links)