Pages that link to "Item:Q4671389"
From MaRDI portal
The following pages link to Model to determine the backup capacity of a wafer foundry (Q4671389):
Displaying 3 items.
- Capacity planning with sequential two-level time constraints in the back-end process of wafer fabrication (Q3055222) (← links)
- Dynamic production control in a serial line with process queue time constraint (Q3163252) (← links)
- Improved customer satisfaction with a hybrid dispatching rule in semiconductor back-end factories (Q3527966) (← links)