Pages that link to "Item:Q4715989"
From MaRDI portal
The following pages link to Note: Bicriteria scheduling for minimizing flow time and maximum tardiness (Q4715989):
Displaying 5 items.
- A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem (Q730912) (← links)
- Interactive evolutionary multi-objective optimization for quasi-concave preference functions (Q976331) (← links)
- Solving multi-criteria scheduling flow shop problem through compromise programming and satisfaction functions (Q1011174) (← links)
- Solving multi-objective production scheduling problems using metaheuristics (Q1887769) (← links)
- Bicriteria scheduling with vacations on a single machine (Q2997965) (← links)