Pages that link to "Item:Q4838330"
From MaRDI portal
The following pages link to The Strategic Use of Capacity Slack in the Economic Lot Scheduling Problem with Random Demand (Q4838330):
Displaying 5 items.
- Quasi-fixed cyclic production schemes for multiple products with stochastic demand (Q322851) (← links)
- The stochastic economic lot scheduling problem: a survey (Q631092) (← links)
- Concerning the theory of workload control (Q1044143) (← links)
- A disruption recovery model for a single stage production-inventory system (Q1926956) (← links)
- Alternative control mechanisms for cyclical scheduling systems (Q3055254) (← links)