Pages that link to "Item:Q4868831"
From MaRDI portal
The following pages link to Control Limits for Multi-stage Manufacturing Processes with Binomial Yield (Single and Multiple Production Runs) (Q4868831):
Displaying 9 items.
- A particle swarm algorithm for inspection optimization in serial multi-stage processes (Q437923) (← links)
- Optimizing a production system with rework and equal sized batch shipments (Q850297) (← links)
- An evolutionary algorithm and discrete event simulation for optimizing inspection strategies for multi-stage processes (Q863977) (← links)
- Supplier diversification under binomial yield (Q957340) (← links)
- Simple optimal replenishment and disposal policies for a product recovery system with leadtimes (Q1374390) (← links)
- Input control in a batch production system with lead times, due dates and random yields (Q1584793) (← links)
- A newsvendor analysis of a binomial yield production process (Q1631521) (← links)
- Optimal procurement and production planning for multi-product multi-stage production under yield uncertainty (Q1713747) (← links)
- Serial production systems with random yield and rigid demand: a heuristic (Q2643803) (← links)