The following pages link to (Q4872477):
Displayed 5 items.
- A branch and bound algorithm for the resource-constrained project scheduling problem (Q1296084) (← links)
- Branch and bound methods for scheduling problems with multiprocessor tasks on dedicated processors (Q1372768) (← links)
- Tabu-search for the multi-mode job-shop problem (Q1384220) (← links)
- Minimizing the weighted number of tardy jobs on multiple machines: a review (Q2358307) (← links)
- (Q4238573) (← links)