Pages that link to "Item:Q4887728"
From MaRDI portal
The following pages link to A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS (Q4887728):
Displaying 25 items.
- A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots (Q336565) (← links)
- A bilevel decomposition algorithm for simultaneous production scheduling and conflict-free routing for automated guided vehicles (Q614066) (← links)
- Tabu search algorithms for job-shop problems with a single transport robot (Q707135) (← links)
- Integrated scheduling of handling equipment at automated container terminals (Q940900) (← links)
- An MILP for scheduling problems in an FMS with one vehicle (Q1042214) (← links)
- A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles (Q1373874) (← links)
- Integrating employee timetabling with scheduling of machines and transporters in a job-shop environment: a mathematical formulation and an anarchic society optimization algorithm (Q1652317) (← links)
- A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times (Q1762161) (← links)
- A multiple-crane-constrained scheduling problem in a container terminal (Q1869692) (← links)
- Joint production and transportation scheduling in flexible manufacturing systems (Q2274861) (← links)
- Integrated production and material handling scheduling using mathematical programming and constraint programming (Q2433554) (← links)
- Survey of research in the design and control of automated guided vehicle systems (Q2575559) (← links)
- A review of design and control of automated guided vehicle systems (Q2576242) (← links)
- Scheduling of machines and automated guided vehicles in FMS using differential evolution (Q3163374) (← links)
- Performance evaluation of dynamic scheduling approaches in vehicle-based internal transport systems (Q3168926) (← links)
- A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles (Q3533189) (← links)
- A hybrid GA/heuristic approach to the simultaneous scheduling of machines and automated guided vehicles (Q4474717) (← links)
- A Multi-Fidelity Model Approach for Simultaneous Scheduling of Machines and Vehicles in Flexible Manufacturing Systems (Q4604918) (← links)
- Simultaneous job input sequencing and vehicle dispatching in a single-vehicle automated guided vehicle system: a heuristic branch-and-bound approach coupled with a discrete events simulation model (Q4681150) (← links)
- Machine scheduling with transportation considerations (Q5932281) (← links)
- The blocking job shop with rail-bound transportation (Q5963615) (← links)
- A multistart biased random key genetic algorithm for the flexible job shop scheduling problem with transportation (Q6079857) (← links)
- Flexible job-shop scheduling with transportation resources (Q6087485) (← links)
- A hybrid particle swarm optimization and simulated annealing algorithm for the job shop scheduling problem with transport resources (Q6106766) (← links)
- Scheduling in manufacturing with transportation: classification and solution techniques (Q6586212) (← links)