Pages that link to "Item:Q4887771"
From MaRDI portal
The following pages link to Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources (Q4887771):
Displayed 11 items.
- Meta-heuristics for dynamic lot sizing: a review and comparison of solution approaches (Q857326) (← links)
- Lagrangean relaxation based heuristics for lot sizing with setup times (Q953424) (← links)
- Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers (Q958558) (← links)
- Finite horizon planning with fixed-interval deliveries and no shortage (Q998721) (← links)
- Production lot sizing in failure prone two-stage serial systems (Q1577124) (← links)
- Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs (Q1781573) (← links)
- Multiple level production planning in rolling horizon assembly environments (Q1809820) (← links)
- Reducing the cost of defects in multistage production systems: A budget allocation perspective (Q1869497) (← links)
- Dynamic capacitated lot-sizing problems: a classification and review of solution approaches (Q2379665) (← links)
- Heuristic algorithms for dynamic capacitated lotsizing for production flow networks with setup times (Q2477097) (← links)
- METAHEURISTIC APPROACHES FOR THE MULTILEVEL RESOURCE-CONSTRAINED LOT-SIZING PROBLEM WITH SETUP AND LEAD TIMES (Q5315988) (← links)