Pages that link to "Item:Q4917224"
From MaRDI portal
The following pages link to New algorithms for coupled tasks scheduling – a survey (Q4917224):
Displaying 5 items.
- Scheduling coupled tasks with exact delays for minimum total job completion time (Q2061138) (← links)
- Coupled task scheduling with exact delays: literature review and models (Q2282490) (← links)
- Parameterized complexity of a coupled-task scheduling problem (Q2283295) (← links)
- Two-machine flowshop scheduling problem with coupled-operations (Q2327688) (← links)
- Complexity of scheduling problem in single-machine flexible manufacturing system with cyclic transportation and unlimited buffers (Q2412847) (← links)