The following pages link to Hugo Hissashi Miyata (Q5058978):
Displaying 2 items.
- Incorporating preventive maintenance into the <i>m</i>-machine no-wait flow-shop scheduling problem with total flow-time minimization: a computational study (Q5058979) (← links)
- An iterated greedy algorithm for the no-wait flowshop scheduling problem to minimize makespan subject to total completion time (Q6094378) (← links)