Pages that link to "Item:Q5322012"
From MaRDI portal
The following pages link to Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach (Q5322012):
Displaying 21 items.
- Optimal \(K\)-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times (Q282247) (← links)
- Robust optimization for the cyclic hoist scheduling problem (Q300031) (← links)
- Scheduling multiple factory cranes on a common track (Q337056) (← links)
- Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance (Q337088) (← links)
- An efficient new heuristic for the hoist scheduling problem (Q342278) (← links)
- Hybrid discrete differential evolution algorithm for biobjective cyclic hoist scheduling with reentrance (Q342566) (← links)
- Linear programming-based algorithms for the minimum makespan high multiplicity jobshop problem (Q490324) (← links)
- A general model for cyclic machine scheduling problems (Q955322) (← links)
- Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm (Q955949) (← links)
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots (Q1042101) (← links)
- A dynamic scheduling approach for optimizing the material handling operations in a robotic cell (Q1654361) (← links)
- A generalized classification scheme for crane scheduling with interference (Q1698922) (← links)
- Automated sortation conveyors: a survey from an operational research perspective (Q1734332) (← links)
- An efficient bicriteria algorithm for stable robotic flow shop scheduling (Q1753515) (← links)
- One-dimensional vehicle scheduling with a front-end depot and non-crossing constraints (Q2454369) (← links)
- A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows (Q3163144) (← links)
- Optimising the Slab Yard Planning and Crane Scheduling Problem using a two-stage heuristic (Q3163219) (← links)
- Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows (Q5058816) (← links)
- Scheduling a wet station for wafer cleaning with multiple job flows and multiple wafer-handling robots (Q5438627) (← links)
- The blocking job shop with rail-bound transportation (Q5963615) (← links)
- Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint (Q6133185) (← links)