Pages that link to "Item:Q5322127"
From MaRDI portal
The following pages link to Recovering Cyclic Schedules Using Dynamic Produce-Up-To Policies (Q5322127):
Displayed 9 items.
- A disruption recovery plan in a three-stage production-inventory system (Q337485) (← links)
- The stochastic economic lot scheduling problem: a survey (Q631092) (← links)
- Managing risk and disruption in production-inventory and supply chain systems: a review (Q898720) (← links)
- Recovery strategies from major supply disruptions in single and multiple sourcing networks (Q1713742) (← links)
- A quantitative model for disruption mitigation in a supply chain (Q1752877) (← links)
- A disruption recovery model for a single stage production-inventory system (Q1926956) (← links)
- Optimal production-inventory policy for the multi-period fixed proportions co-production system (Q2273903) (← links)
- Real time disruption management for a two-stage batch production-inventory system with reliability considerations (Q2514816) (← links)
- Adopting a hierarchical diagnosis and treatment system to optimize elective surgery scheduling (Q6047887) (← links)