Pages that link to "Item:Q5385383"
From MaRDI portal
The following pages link to Design and operation of dynamic assembly lines using work-sharing (Q5385383):
Displayed 8 items.
- Balancing mixed-model assembly lines using adjacent cross-training in a demand variation environment (Q342134) (← links)
- Throughput optimization in two-machine flowshops with flexible operations (Q983633) (← links)
- Embedding optimization with deterministic discrete event simulation for assignment of cross-trained operators: an assembly line case study (Q2273660) (← links)
- A FPTAS for a two-stage hybrid flow shop problem and optimal algorithms for identical jobs (Q2637353) (← links)
- Sample Path Optimal Policies for Serial Lines with Flexible Workers (Q2897164) (← links)
- Operator allocation planning for reconfigurable production line in one-of-a-kind production (Q2997882) (← links)
- Bi-directional work sharing in assembly lines with strict and flexible assembly sequences (Q3019228) (← links)
- Some new results on the analysis and simulation of bucket brigades (self-balancing production lines) (Q3114300) (← links)