Pages that link to "Item:Q5428715"
From MaRDI portal
The following pages link to Multiple machine JIT scheduling: a tabu search approach (Q5428715):
Displaying 6 items.
- Control methods for dynamic time-based manufacturing under customized product lead times (Q439459) (← links)
- Iterated search methods for earliness and tardiness minimization in hybrid flowshops with due windows (Q1652188) (← links)
- Self-imposed time windows in vehicle routing problems (Q2018105) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- A parameter-less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows (Q2673560) (← links)
- Simulation optimisation of pull control policies for serial manufacturing lines and assembly manufacturing systems using genetic algorithms (Q3163313) (← links)