The following pages link to Jay B. Ghosh (Q548012):
Displaying 10 items.
- Minimizing weighted mean absolute deviation of job completion times from their weighted mean (Q548013) (← links)
- Scheduling with tool changes to minimize total completion time: Basic results and SPT performance (Q703937) (← links)
- Scheduling with tool changes to minimize total completion time under controllable machining conditions (Q868153) (← links)
- Customer order scheduling on a single machine with family setup times: complexity and algorithms (Q870129) (← links)
- CON due-date determination and sequencing (Q908841) (← links)
- Scheduling about a common due date with earliness and tardiness penalties (Q908845) (← links)
- New heuristic for the dynamic layout problem (Q4661238) (← links)
- Note—A Note on the Minimization of Mean Squared Deviation of Completion Times About a Common Due Date (Q4733656) (← links)
- Siting Facilities along a Line when Equity of Service is Desirable (Q4887717) (← links)
- Analysis of Lagrangian Lower Bounds for a Graph Partitioning Problem (Q4950824) (← links)