Pages that link to "Item:Q5564932"
From MaRDI portal
The following pages link to Optimal Production Scheduling and Employment Smoothing with Deterministic Demands (Q5564932):
Displaying 7 items.
- A forward algorithm and planning horizon procedure for the production smoothing problem without inventory (Q595502) (← links)
- Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure (Q1107425) (← links)
- Note on utilizing stochastic optimal control in aggregate production planning (Q1261380) (← links)
- Design of production-inventory control systems incorporating fast-sampling control policies with implementation lead time (Q3712175) (← links)
- Production scheduling and inventory control for multi-stage manufacturing systems (Q3770355) (← links)
- Singular pertubation methods in the synthesis of control policies for production-inventory systems (Q3950399) (← links)
- Discounted production scheduling and employment smoothing (Q5556198) (← links)