Pages that link to "Item:Q5689382"
From MaRDI portal
The following pages link to Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (Q5689382):
Displaying 50 items.
- Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing (Q257213) (← links)
- On the efficient modeling and solution of the multi-mode resource-constrained project scheduling problem with generalized precedence relations (Q280157) (← links)
- A rough-cut capacity planning model with overlapping (Q280165) (← links)
- An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (Q296973) (← links)
- MIP models for resource-constrained project scheduling with flexible resource profiles (Q297247) (← links)
- Scheduling resource-constrained projects with a flexible project structure (Q319777) (← links)
- Practical solutions for a dock assignment problem with trailer transportation (Q319870) (← links)
- Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP (Q322615) (← links)
- Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation (Q336432) (← links)
- Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (Q337299) (← links)
- Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem (Q415556) (← links)
- A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling (Q421082) (← links)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579) (← links)
- An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations (Q439614) (← links)
- Project scheduling with flexible resources: formulation and inequalities (Q443821) (← links)
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm (Q444285) (← links)
- A dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimization (Q473573) (← links)
- Multi-project scheduling with two-stage decomposition (Q490148) (← links)
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies (Q526633) (← links)
- Applying local rescheduling in response to schedule disruptions (Q613784) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- New concepts for activity float in resource-constrained project management (Q622136) (← links)
- Predetermined intervals for start times of activities in the stochastic project scheduling problem (Q646669) (← links)
- Event-based MILP models for resource-constrained project scheduling problems (Q709100) (← links)
- Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems (Q709108) (← links)
- Time-constrained project scheduling with adjacent resources (Q709144) (← links)
- A path enumeration approach for the analysis of critical activities in fuzzy networks (Q713412) (← links)
- Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective (Q744648) (← links)
- Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment (Q744657) (← links)
- Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations (Q747041) (← links)
- Exact and flexible solution approach to a critical chain project management problem (Q823776) (← links)
- When it is worthwhile to work with the stochastic RCPSP? (Q835549) (← links)
- A two-stage stochastic programming approach for project planning with uncertain activity durations (Q835555) (← links)
- The discrete time/cost trade-off problem: Extensions and heuristic procedures (Q835571) (← links)
- Time-constrained project scheduling (Q835591) (← links)
- Experimental investigation of heuristics for resource-constrained project scheduling: an update (Q858327) (← links)
- Simulation of stochastic demand data streams for network revenue management problems (Q858607) (← links)
- Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting (Q859913) (← links)
- A genetic algorithm for resource investment problem with discounted cash flows (Q865553) (← links)
- A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty (Q872245) (← links)
- A mathematical model for the multi-mode resource-constrained project scheduling problem with mode dependent time lags (Q929315) (← links)
- A random key based genetic algorithm for the resource constrained project scheduling problem (Q947946) (← links)
- Improving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problem (Q954251) (← links)
- A random generator of resource-constrained multi-project network problems (Q964864) (← links)
- An exact algorithm for minimizing resource availability costs in project scheduling (Q976490) (← links)
- On the latest starting times and criticality of activities in a network with imprecise durations (Q988966) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A new path-based cutting plane approach for the discrete time-cost tradeoff problem (Q993703) (← links)
- Preemptive scheduling and antichain polyhedra (Q1003473) (← links)
- Differential evolution for solving multi-mode resource-constrained project scheduling problems (Q1010277) (← links)