Pages that link to "Item:Q5929148"
From MaRDI portal
The following pages link to Part sequencing in three-machine no-wait robotic cells (Q5929148):
Displayed 11 items.
- A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots (Q336565) (← links)
- A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell (Q632670) (← links)
- Approximation algorithms for \(k\)-unit cyclic solutions in robotic cells (Q706905) (← links)
- Sequencing and scheduling in robotic cells: recent developments (Q880509) (← links)
- An optimization-based heuristic for the robotic cell problem (Q1040983) (← links)
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots (Q1042101) (← links)
- A survey of scheduling problems with no-wait in process (Q1751258) (← links)
- A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line (Q1779707) (← links)
- Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints (Q2467264) (← links)
- A review of TSP based approaches for flowshop scheduling (Q2572854) (← links)
- Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times (Q3163706) (← links)