Pages that link to "Item:Q5943554"
From MaRDI portal
The following pages link to A review of planning and scheduling systems and methods for integrated steel production (Q5943554):
Displaying 13 items.
- Models for scheduling charges in continuous casting: application to a Brazilian steel plant (Q276311) (← links)
- A novel Lagrangian relaxation approach for a hybrid flowshop scheduling problem in the steelmaking-continuous casting process (Q299834) (← links)
- A soft-decision based two-layered scheduling approach for uncertain steelmaking-continuous casting process (Q319506) (← links)
- An effective co-evolutionary artificial bee colony algorithm for steelmaking-continuous casting scheduling (Q322540) (← links)
- A multi-objective optimization approach for integrated production planning under interval uncertainties in the steel industry (Q342399) (← links)
- Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm (Q400054) (← links)
- A GRASP heuristic for slab scheduling at continuous casters (Q480761) (← links)
- Optimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch size (Q541698) (← links)
- Batching decisions for assembly production systems (Q703918) (← links)
- STRUCTURAL AND EXTREMAL PROPERTIES OF THE HOT ROLLING BATCHES PRECEDENCE GRAPH (Q4581423) (← links)
- A genetic algorithm for the steel continuous casting with inter-sequence dependent setups and dedicated machines (Q4634331) (← links)
- Modeling and solving the steelmaking and casting scheduling problem (Q6066683) (← links)
- A metaheuristic algorithm for a locomotive routing problem arising in the steel industry (Q6167423) (← links)